New Stockrooms

0

September 18, 2013 by Darren

schoolo1 011

New storage and a complete renovate was required at a Primary School in Bolton.  Darren at D.Power Construction was asked to renovate and install new shelving to 3 old stockrooms.  The old plaster was knocked off and then re-boarded and skimmed, the walls were then painted. New light sockets and switches were installed, the floor was re painted and new bespoke shelving was made and installed into the stockrooms.