Front Reception area renovation

0

April 27, 2014 by Darren

IMG_3024

A Primary School in Horwich, Bolton had a large reception area and required the area to be split to accommodate another member of staff. The area was divided into 2 with a studded partition wall. The 2 new rooms were plaster boarded and skimmed. A vision panel was fitted in between the 2 rooms. 2 new doors including a new Beech pre finished fire door was supplied and fitted. Externally brick work was removed to allow for a second window in the back office, with a new pillar in between the windows to match the existing window.  2 Upvc white windows was then supplied and installed. New carpet was fitted to complete the offices.