schoolo1 039

Lever Edge Primary School Bolton asked D.Power Construction to renovate their Dining area at the school.  The asbestos ceiling was professional removed and a new suspended ceiling and ceiling tiles installed. The old radiators were removed and 7 new panel radiators supplied and fitted.  The ceiling had new ceiling lights and new data cabling installed into the Hall.  New floor covering was also installed. All the exposed pipework was boxed in and the steel girders were cloaked in solid Beech hardwood.  Under each of the 5 windows a studded partition was made, which was to accommodate the new radiators,the walls were skimmed and new window cills were installed. The whole room was re-skimmed and decorated. 5 new Beech wooden blinds were supplied by Aspiration Blinds and fitted by D.Power Construction.