A Shiny New Bathroom
0November 25, 2012 by Darren

This bathroom was a complete rip out and re design.
The main bathroom was separate from the toilet and therefore internal walls were removed to make to bathroom a lot bigger. Tiles were removed as well as the floor. As the customer wanted the bathroom suite in a different position, new pipe work and plumbing was installed, under floor heating was installed then new floorboards fixed. A new white bathroom suite was installed with floor and wall tiles.
Category Our Work | Tags: bathrooms, Bolton builder